Upcoming Events

International | Environment

no events match your query!

New Events

International

no events posted in last week

Blog Feeds

Anti-Empire

Anti-Empire

offsite link North Korea Increases Aid to Russia, Mos... Tue Nov 19, 2024 12:29 | Marko Marjanovi?

offsite link Trump Assembles a War Cabinet Sat Nov 16, 2024 10:29 | Marko Marjanovi?

offsite link Slavgrinder Ramps Up Into Overdrive Tue Nov 12, 2024 10:29 | Marko Marjanovi?

offsite link ?Existential? Culling to Continue on Com... Mon Nov 11, 2024 10:28 | Marko Marjanovi?

offsite link US to Deploy Military Contractors to Ukr... Sun Nov 10, 2024 02:37 | Field Empty

Anti-Empire >>

The Saker
A bird's eye view of the vineyard

offsite link Alternative Copy of thesaker.is site is available Thu May 25, 2023 14:38 | Ice-Saker-V6bKu3nz
Alternative site: https://thesaker.si/saker-a... Site was created using the downloads provided Regards Herb

offsite link The Saker blog is now frozen Tue Feb 28, 2023 23:55 | The Saker
Dear friends As I have previously announced, we are now “freezing” the blog.? We are also making archives of the blog available for free download in various formats (see below).?

offsite link What do you make of the Russia and China Partnership? Tue Feb 28, 2023 16:26 | The Saker
by Mr. Allen for the Saker blog Over the last few years, we hear leaders from both Russia and China pronouncing that they have formed a relationship where there are

offsite link Moveable Feast Cafe 2023/02/27 ? Open Thread Mon Feb 27, 2023 19:00 | cafe-uploader
2023/02/27 19:00:02Welcome to the ‘Moveable Feast Cafe’. The ‘Moveable Feast’ is an open thread where readers can post wide ranging observations, articles, rants, off topic and have animate discussions of

offsite link The stage is set for Hybrid World War III Mon Feb 27, 2023 15:50 | The Saker
Pepe Escobar for the Saker blog A powerful feeling rhythms your skin and drums up your soul as you?re immersed in a long walk under persistent snow flurries, pinpointed by

The Saker >>

Public Inquiry
Interested in maladministration. Estd. 2005

offsite link RTEs Sarah McInerney ? Fianna Fail?supporter? Anthony

offsite link Joe Duffy is dishonest and untrustworthy Anthony

offsite link Robert Watt complaint: Time for decision by SIPO Anthony

offsite link RTE in breach of its own editorial principles Anthony

offsite link Waiting for SIPO Anthony

Public Inquiry >>

Voltaire Network
Voltaire, international edition

offsite link Voltaire, International Newsletter N?113 Fri Dec 20, 2024 10:42 | en

offsite link Pentagon could create a second Kurdish state Fri Dec 20, 2024 10:31 | en

offsite link How Washington and Ankara Changed the Regime in Damascus , by Thierry Meyssan Tue Dec 17, 2024 06:58 | en

offsite link Statement by President Bashar al-Assad on the Circumstances Leading to his Depar... Mon Dec 16, 2024 13:26 | en

offsite link Voltaire, International Newsletter N?112 Fri Dec 13, 2024 15:34 | en

Voltaire Network >>

M3 Will Kill Navan Rail Link; Lismullin Can Still be Saved - Campaigners

category international | environment | press release author Monday January 07, 2008 00:09author by Brian Guckian & Tadhg Crowley Report this post to the editors

It is highly unlikely that the proposed Navan rail link can be economically viable if the M3 motorway is completed in its present tolled and over-specified format, the promoters of the Meath MASTER Plan have warned.

PRESS RELEASE

For Release 7/1/2008

Transport researcher Brian Guckian and environmental campaigner Tadhg Crowley have said that the forthcoming economic downturn made future capital funding for any rail link additional to the M3 extremely doubtful, especially as a railway would also take lucrative toll revenue from the motorway.

Mr. Guckian pointed to a study he completed in 2005 that showed the M3 in its current form would also generate total costs, conservatively estimated, of at least € 5.6 billion over 30 years due to its CO2 emissions, increased fuel dependency and tolling arrangements.

Mr. Crowley and Mr. Guckian added that the National Monument at Lismullin Co. Meath, which is now under threat from the M3 motorway works, can still be preserved and reconstructed using mechanisms provided for in the MASTER Plan, and that there were sufficient remaining structures and archaeological data on hand to facilitate this work. It would then be protected, along with other important sites in the area, via designation of the region as a UNESCO World Heritage site called the Meath World Heritage Park.

The MASTER Plan - standing for Model Archaeological and Sustainable Economic Region - is an advanced development plan that solves the current issues around the controversial M3 motorway without any re-routing, preserves the Tara Landscape as a cultural resource, and provides a high-quality rail link serving the population centres of Ashbourne, Dunshaughlin, Navan and Kells.

A further element of the Plan is conversion of the northern "footprint" of the M3 beyond Dunshaughlin to the "2+1" road format and the replacement of the section through the Tara-Skryne Valley with 2+1 on the existing N3 primary road. The modifications would be made possible by dramatically reduced traffic volumes brought about by the complementary rail and coach services which would operate at high-frequency and capacity.

These aspects of the plan would save € 350m in costs that would then be used to buy out the project's toll scheme and permit rapid re-construction of the nearby rail link, which has been delayed indefinitely due to competition from the double-tolled motorway.

Mr. Guckian and Mr. Crowley said that they were satisfied that they had submitted a creative, responsible and extremely cost-effective plan to government, and welcomed broad support for the framework to date. "Sustainable development brings with it very significant economic savings and benefits, and we believe we have offered an excellent choice on this issue to those in power; one that represents effective, "joined-up" thinking. The works in the Tara-Skryne Valley can be halted immediately and our proposals implemented; it is simply a matter of collective will on the part of the Cabinet", they said.

The Plan has been circulated to the Taoiseach and to several Ministers including those with responsibility for Transport; Environment; Energy & Communications; and Arts, Sport & Tourism. It is also with Meath County Council and has been available to the public since its launch in September. A detailed Implementation Roadmap for the Plan was circulated to government departments prior to Christmas.

ENDS

Contact:

Brian Guckian 087 9140105
[email protected]

Tadhg Crowley


Related Link: http://www.meathmasterplan.com
© 2001-2024 Independent Media Centre Ireland. Unless otherwise stated by the author, all content is free for non-commercial reuse, reprint, and rebroadcast, on the net and elsewhere. Opinions are those of the contributors and are not necessarily endorsed by Independent Media Centre Ireland. Disclaimer | Privacy