Upcoming Events

Mayo | Environment

no events match your query!

New Events

Mayo

no events posted in last week

Blog Feeds

Anti-Empire

Anti-Empire

offsite link North Korea Increases Aid to Russia, Mos... Tue Nov 19, 2024 12:29 | Marko Marjanovi?

offsite link Trump Assembles a War Cabinet Sat Nov 16, 2024 10:29 | Marko Marjanovi?

offsite link Slavgrinder Ramps Up Into Overdrive Tue Nov 12, 2024 10:29 | Marko Marjanovi?

offsite link ?Existential? Culling to Continue on Com... Mon Nov 11, 2024 10:28 | Marko Marjanovi?

offsite link US to Deploy Military Contractors to Ukr... Sun Nov 10, 2024 02:37 | Field Empty

Anti-Empire >>

The Saker
A bird's eye view of the vineyard

offsite link Alternative Copy of thesaker.is site is available Thu May 25, 2023 14:38 | Ice-Saker-V6bKu3nz
Alternative site: https://thesaker.si/saker-a... Site was created using the downloads provided Regards Herb

offsite link The Saker blog is now frozen Tue Feb 28, 2023 23:55 | The Saker
Dear friends As I have previously announced, we are now “freezing” the blog.? We are also making archives of the blog available for free download in various formats (see below).?

offsite link What do you make of the Russia and China Partnership? Tue Feb 28, 2023 16:26 | The Saker
by Mr. Allen for the Saker blog Over the last few years, we hear leaders from both Russia and China pronouncing that they have formed a relationship where there are

offsite link Moveable Feast Cafe 2023/02/27 ? Open Thread Mon Feb 27, 2023 19:00 | cafe-uploader
2023/02/27 19:00:02Welcome to the ‘Moveable Feast Cafe’. The ‘Moveable Feast’ is an open thread where readers can post wide ranging observations, articles, rants, off topic and have animate discussions of

offsite link The stage is set for Hybrid World War III Mon Feb 27, 2023 15:50 | The Saker
Pepe Escobar for the Saker blog A powerful feeling rhythms your skin and drums up your soul as you?re immersed in a long walk under persistent snow flurries, pinpointed by

The Saker >>

Public Inquiry
Interested in maladministration. Estd. 2005

offsite link RTEs Sarah McInerney ? Fianna Fail?supporter? Anthony

offsite link Joe Duffy is dishonest and untrustworthy Anthony

offsite link Robert Watt complaint: Time for decision by SIPO Anthony

offsite link RTE in breach of its own editorial principles Anthony

offsite link Waiting for SIPO Anthony

Public Inquiry >>

Voltaire Network
Voltaire, international edition

offsite link Voltaire, International Newsletter N?110 Fri Nov 29, 2024 15:01 | en

offsite link Verbal ceasefire in Lebanon Fri Nov 29, 2024 14:52 | en

offsite link Russia Prepares to Respond to the Armageddon Wanted by the Biden Administration ... Tue Nov 26, 2024 06:56 | en

offsite link Voltaire, International Newsletter N?109 Fri Nov 22, 2024 14:00 | en

offsite link Joe Biden and Keir Starmer authorize NATO to guide ATACMS and Storm Shadows mis... Fri Nov 22, 2024 13:41 | en

Voltaire Network >>

Wind Turbine building at Rossport Solidarity Camp

category mayo | environment | news report author Tuesday September 04, 2012 21:42author by C - RSCauthor email rossportsolidaritycamp at gmail dot comauthor phone 085-1141170 Report this post to the editors

From the 10th to 16th of August, Rossport Solidarity Camp hosted it's 3rd wind turbine building course. You can read a report of the first one here: http://www.indymedia.ie/article/95731. As the 3 previous turbines that were built are still going strong (and powering both the camp and camp house), this year it was decided to go for something bigger and more challenging. This year it's was decided to build a 4.2 metre turbine that is planned eventually to be connected to the grid at the house of a local Shell to Sea campaigner.
wt_indy1.jpg

The course which was originally scheduled to run from the 4th to the 10th August had to be delayed for 2 days after Shell go their TBM stuck, which as well as disrupting local traffic also disrupted the scheduling plans for the turbine course..

The course was once again run by the wind turbine collective V3 (http://www.v3power.co.uk), working from the Hugh Piggott design (http://scoraigwind.co.uk).

By the weeks end we had a working turbine built that once installed is hoped to produce in the region of 400 to 500 kWh per month.

Big thanks to all involved, in particular to the V3. Also thanks to environmental NGO Gluaiseacht (http://www.gluaiseacht.ie) for funding, who along with funding from Lush (http://www.lush.co.uk/our-values/campaigns) helped us run the course.

We will be installing the turbine in the week starting on the 17th September. The plan is initially to install the turbine for heating water, with eventually (finance permitting) the turbine to be connected to the grid.
We will also be running a wind turbine maintenance weekend on the 15th & 16th September, during which we will be doing maintenance work on the 3 camp turbines (and also doing some construction work on the 1.8m turbine we're currently building). Please let us know if you're coming ([email protected]). The cost is just a donation of what you can afford.

Related Link: http://www.rossportsolidaritycamp.org

Carving the blades which are made from native Douglas fir.
Carving the blades which are made from native Douglas fir.

Winding the copper coils
Winding the copper coils

wt_indy5.jpg

Preparing the copper coils for joining
Preparing the copper coils for joining

author by C - RSCpublication date Tue Sep 04, 2012 21:47author address author phone Report this post to the editors

..

Placing the magnet on the rotor disks
Placing the magnet on the rotor disks

wt_indy10.jpg

Adding the resin to make up the 2 rotor disks
Adding the resin to make up the 2 rotor disks

Cleaning up the stator (which is made up of copper coils in resin)
Cleaning up the stator (which is made up of copper coils in resin)

wt_indy13.jpg

author by C - RSCpublication date Tue Sep 04, 2012 21:52author address author phone Report this post to the editors

..

The turbine frame on the tower head
The turbine frame on the tower head

Some finishing touches
Some finishing touches

Work also continued on a smaller turbine
Work also continued on a smaller turbine

Assembling the turbine for testing
Assembling the turbine for testing

Getting the blades balanced
Getting the blades balanced

 
© 2001-2024 Independent Media Centre Ireland. Unless otherwise stated by the author, all content is free for non-commercial reuse, reprint, and rebroadcast, on the net and elsewhere. Opinions are those of the contributors and are not necessarily endorsed by Independent Media Centre Ireland. Disclaimer | Privacy